top of page

Airbus delivers second C-295MW SAR to Spain

Defence Daily Brief
8 hours ago
2 min read

Airbus has delivered the second C-295 MW SAR (Search and Rescue) or C-295 MSA to the Ejército del Aire y del Espacio (Spanish Air Force and Space) on November 16. It will be operated from the Gando Air Base in the Canary Islands. The C-295 MW is the SAR version of the C-295 MW aircraft. The first aircraft was delivered on June 24.


The aircraft is assembled at the Airbus Final Assembly Line in San Pablo, Seville, Spain. On December 20, 2023, the Spanish Ministry of Defence ordered 16 Airbus C-295 aircraft in Maritime Patrol Aircraft (MPA) configuration and Maritime Surveillance Aircraft (MSA) configuration. The contract amounts to €1.695 billion, which is $1.8647 billion.


The C-295 MSA is the replacement for the CN-235 VIGMA aircraft fleet, which has been in service with the Spanish Air and Space Force since 2008. It will be primarily equipped for maritime and overland operations such as anti-smuggling, anti-illegal immigration and anti-drug trafficking operations, as well as national and international search-and-rescue missions.


C-295MW is a twin-turboprop transport aircraft made by Airbus. The aircraft in transport configuration has the capacity to carry up to eight tonnes of payload. It can carry 70 troops, or 50 paratroopers. The aircraft is designed to take off and land on unprepared runways, perform cargo and paratrooper drops, as well as perform medical evacuation. Powered by two Pratt & Whitney Canada PW127G turboprop engines, the C-295 offers excellent manoeuvrability and fuel efficiency, enabling endurance of up to 13 hours.


Airbus will also deliver two additional maritime surveillance C-295 aircraft this year out of a total order of eight, alongside the first two C-295 aircraft in transport configuration from the Spanish Ministry of Defence’s 2025 order. The delivery of the first C-295 in Maritime Patrol Aircraft (MPA) configuration for Spain, the most complex mission variant of the C-295 to date, is planned for 2028.

 
 
 

Comments


bottom of page